Replacement footbridge, Lowestoft
The contractor appointed to replace a footbridge in a park setting, provided Steria Consulting with a sketch of the replacement bridge. Steria Consulting specified the member sizes and connection details for the bridge, taking into account considerations such as the potential loads the bridge would carry, the state of the region where it will be built, and future maintenance.